Public Notices
There are no public notices at this time.
Completed and Planned Sites Reports
The following reports list VRP sites that have been issued certificates (completed sites) and VRP sites that are currently enrolled in the program (planned sites). For completed sites, if the site is not suitable for unrestricted use, the institutional control that is relied upon in the remedy is identified.
Completed Sites Report in Adobe PDF Format.
Planned Sites Report in Adobe PDF Format.
Institutional Controls
Restrictions on future use of a site may be required to meet remediation levels that present no unacceptable risk to human health and/or the environment. Institutional controls are legal or contractual restrictions on property use that remain effective after remediation is completed and are used to satisfy remediation levels. The certificate of satisfactory completion of remediation is contingent on any proposed institutional controls being recorded as deed restrictions. These deed restrictions "run with the land" and would apply to future owners as well.
The Completed Sites Report lists sites that have been issued a certificate and the institutional controls that have been recorded for those sites. The institutional controls are keyed as follows:
GW - Groundwater use restrictions have been recorded
RES - Residential use restrictions have been recorded
EX - Restrictions on excavation below the land surface have been recorded
OTHER - Other restrictions on land use have been recorded
NONE - No restrictions have been recorded
VRP Semi-Annual Site Summaries
October 2012 - March 2013
April 2012 - September 2012